Mechanical Room Rebuild After A Fire


Due to a fire in this mechanical room, RES immediately placed a temporary chiller.

The room had been completely burned beyond repair and the owner contracted with RES for a total rebuild of the mechanical room.

The only thing surviving the fire was the domestic circulating pumps.

Project in progress – New domestic boilers being set in place.

New expansion tanks

Fabrication of piping. This property has a 2-pipe system and has been reinstalled with an auto switchover control system.

Chilled Water Pumps.

This photo contains the expansion tanks and the buffering tanks which will allow the auto switchover process.

New 90% efficient Lochinvar Crest condensing boilers.

New air cooled chiller being set into position.

Project included installation of 2 York Air Cooled chillers.